In November 2013, we signed an agreement for the implementation of stainless steel components for one of the largest investments in Podlasie that is construction of the University of Bialystok campus. The agreement was signed with the general contractor Mostostal Warszawa.
The implementation includes:
- 2300m stainless steel railings
- 256units of column casings made of stainless steel, satin finish
- black steel stairs
- stainless steel constructions terrariums
- Housing facade made of stainless steel net
- 64 lamp posts
- 73 benches
- Dump shed
- 24 rubbish bins
- 8units of post protectors with a diameter of 1200mm
- DNA sculpture
- Foucault's Pendulum
- 4 gates with automatic mechanism
- 800m of fence
- 2400m decorative angles over the tiles line in the gangways
REALIZACJE
The University of Bialystok Campus